| |
 |
Proposal and Contract review
– Written down procedure and already existing forms
to ensure no ambiguity |
| |
|
|
| |
 |
Defining
Acceptance Criteria and Preparation of Acceptance Plan
– The aim of this procedure is to ensure that acceptance
activities are carried out as scheduled. The acceptance plan
is prepared following the requirement analysis study. The
procedure results in clear and unambiguous acceptance criteria
of client requirements and preparation of Acceptance Test
Plan |
| |
|
|
| |
 |
Change
Control – Change management is a critical
component of process management. We have an established process
to receive changes, understand them and categorize them as
minor or major. Minor changes are taken care by Delivery Head,
while any major change is sent for approval to Client.
|
| |
|
|
| |
 |
Configuration
Management – To configure software items
(programs and
documents) and monitor their status and control changes to
configurable items throughout the life cycle of the project.
These will include any CRM Software, Call Logger Software
and other related support software.
|
| |
|
|
| |
 |
Final
Inspection and Delivery – To perform
the final inspection and delivery of deliverable as per the
agreement/proposal. It results in a final inspection report
and delivery of final deliverables to the client as per the
proposal. This procedure also helps us to apply the metrics
as a measurement to determine the rating levels of the process
management and assess the quality of the service.
|
| |
|
|
| |
 |
Handling
Deviations – This procedure helps us
to review concessions and
resolve deviations of activities from service level, service
standards and procedures. It helps resolve any non-compliance’s
raised during service audits.
|
| |
|
|
| |
 |
Human
Resource Planning – Procedure to allocate
various human resources to different projects and planning
for their future assignments.
|
| |
|
|
| |
 |
Inspection
of In-coming equipment, PCs, Servers, Tel and so on
–
Procedure to ensure that in-coming material meets the required
specifications. This procedure is applicable to the following.
| |
 |
Capital
goods and computer consumable |
| |
 |
Software
used |
| |
 |
Computer
and communication hardware |
| |
 |
A
tool intended to assist in the Training, monitoring of
agents |
| |
 |
Contract
staff |
| |
 |
Maintenance
and customer support services |
| |
 |
Training
courses and materials |
| |
|
|
|
| |
 |
Peer
Review – Inspection: This procedure
is mandatory for all process management. Peer review Inspection
is conducted at the following instances:
| |
 |
Review
of process management plan of a fresh order/ project |
| |
 |
Review
of contract, agreement and any document, which needs customer
sign-off from the customer |
| |
 |
All
external deliverables and the documents/components, which
are critical for the requisite servicing the clients |
| |
 |
The
procedure marks the satisfactory completion of the reviewed
inputs and results in a sign-off from the quality analyst |
|